USACE Vicksburg | Infrastructure Survey, Yazoo Backwater Pumping Plant
- Jun 17
- 1 min read

The Yazoo Backwater Pumping Plant protects a 630,000-acre region where the 2019 flood submerged over 550,000 acres and caused $800 million in agricultural losses. ES2, in joint venture with Chustz Surveying, established survey control, conducted multibeam hydrographic surveys, and delivered topographic and cross-section data to support this critical federal infrastructure project.


